Login   |      Register
English    中文


The various measures had been taken by the department of Songliao Commission to take on heavy rainfall in Songliao Basin in August 2017

2023-04-06  |   Editor : houguangbing  
Category : Technological

Affected by No.10 typhoon "Haitang" residual system and the upper trough, the central and south of Songliao Basin were attacked by the heavy rain in August, 2017.

The Songliao Commission attaches great importance to reducing the risk of the heavy rainfall and takes various of measures to respond positively. First, it is necessary to strengthen consultations and research. The Commission Director presided over the two consecutive flood control consultation meetings, analysis of basin water rainfall situation and deployment were done. Secondly, the weather changes had been closely monitored to carry out rolling hydrological forecasting, hydrological forecasting by the main encryption frequency, and updating rainfall prediction according to the actual situation. The grade-IV for the flood emergency response was started by Total Drought Relief Coordination Leading Group for Songhua River. To meet the national headquarters requirements, 4 working teams were respectively assigned to 4 provinces-Heilongjiang, Jilin, Liaoning and Inner Mongolia to guide work and view the flood situation, the unmanned equipment was used to collect on-site flood situation and timely delivery all-round and three-dimensional information.

    Sign in for comments!

Comment list ( 0 )

 



Most concern
Recent articles